Lakeview Condo #4 Insulation and Drywall
BELOW: Insulation and fire sealing has been completed. We insulated every wall we could. Interior walls were also
insulated for sound control anywhere feasible.
BELOW: The patch in the living room where the door was covered up is completed.
BELOW: The new master bedroom walls have received drywall. Finish work is complete and sanded.
BELOW: The areas still lacking drywall shall receive Concrete Permabase tile backer in lieu of drywall. Tile backer is
included in the tile labor and is installed by tile installer.
BELOW: Note the two layers of drywall and the walls shared with the hallway. The red drywall mud is special fire
rated drywall compound. The drywall itself is 5/8" firerated sheetrock. Note the green board over top of the drywall
above the shower area.
BELOW: At the bottom of the shower, we installed the Concrete Permabase as the fire barrier. A second layer
of Concrete Permabase will be installed over this layer. Note the bench will be installed inside the shower pan.
BELOW: Portion of walls to receive wainscotting shall also have a Concrete Permabase tile backer. All other drywall
is complete.
BELOW: The following photos show the current plan for the vanity with respect to the rough in plumbing.
BELOW: The patch in the hallway is completed.